Archive - Nov 11, 2009
ARISSat-1 development team meets in Phoenix
Many of the ARISSat team met in Phoenix over a weekend in late October to work on software integration, to assemble the spaceframe and to make final measurements for the new cables.
The team put in long hours at the Microchip facility where a number of new milestones were met.
• The satellite was commanded via a radio.
• New PSU (power supply unit) board was tested in the system.
• New ICU (Interconnect board) was tested in the system.
• New MPPT (Max Power Point Tracker) boards were tested with solar panels.
• New solar panel test structure was built and used to test the power system.
aa4kn – Wed, 2009 – 11 – 11 11:49
ISS Radio Report
Date/Time:
9 years 6 weeks ago
Mode:
PACKET
Status:
ACTIVE
Uplink:
VHF
Downlink:
VHF (other) Description:
Heard over Malaysia at 9M2RPN
11-Nov-09 15:24:02 p2 RS0ISS-3
11-Nov-09 15:23:07 p2 RS0ISS-11
11-Nov-09 15:22:18 p2 YC3BVG-6 via digi
Sangat, 9M2SS
Sangat9M2SS – Wed, 2009 – 11 – 11 08:32
ISS Radio Report
Date/Time:
9 years 6 weeks ago
Mode:
PACKET
Status:
ACTIVE
Uplink:
VHF
Downlink:
VHF (other) Description:
ACTIVE Over Indonesia ..
Fm RS0ISS-11 To VK6CO [12:44:58]
Welcome to RS0ISS's message board
System Ver 1.50 108024 Bytes free
Fm RS0ISS-11 To VK6CO [12:45:00]
Fm RS0ISS-11 To VK6CO [12:45:04]
CMD(F/K/M/R/W/B/H/?)>
YC3BVG – Wed, 2009 – 11 – 11 06:52