Archive - Nov 2, 2007
ISS Radio Report
Date/Time:
11 years 8 weeks ago
Mode:
PACKET
Status:
ACTIVE
Uplink:
VHF
Downlink:
VHF (other) Description:
33 elevation 21:10 UTC only beacon heard.
MAURICIO BERALDO PY4MAB
BRAZIL
PY4MAB – Fri, 2007 – 11 – 02 21:21
Crews Wrap up Spacewalk Preps
N5VHO – Fri, 2007 – 11 – 02 20:48
ISS Radio Report
Date/Time:
11 years 8 weeks ago
Mode:
PACKET
Status:
NOT ACTIVE
Uplink:
VHF
Downlink:
VHF (other) Description:
Nothing heard over Brazil - GI84ov.
PS8RF – Fri, 2007 – 11 – 02 19:34
Crews Continue Spacewalk Preparations
The STS-120 and Expedition 16 crews will continue to work today on the tools and procedures for Saturday's spacewalk to repair a torn solar array. Mission Specialists Scott Parazynski and Doug Wheelock will conduct the excursion, which is slated to kick off at 6:28 a.m. EDT Saturday.
Parazynski will make the repair while suspended from a boom attached to the space station's robotic arm, and Wheelock will assist from the station's truss. Mission Specialist Stephanie Wilson and Expedition 16 Flight Engineer Dan Tani will be operating the station's robotic arm from the robotic work station inside the Destiny laboratory. Mission Specialist Paolo Nespoli will be the spacewalk coordinator.
N5VHO – Fri, 2007 – 11 – 02 10:50
ISS Radio Report
Date/Time:
11 years 8 weeks ago
Mode:
PACKET
Status:
NOT ACTIVE
Uplink:
VHF
Downlink:
VHF (other) Description:
Nothing heard in JO21fe
ON5APO – Fri, 2007 – 11 – 02 08:34