Archive - Dec 14, 2006
STS-116 MCC Status Report #11
Two spacewalking electricians completed half of STS-116's rewiring today, and when flight controllers threw the switch, the lights inside the International Space Station turned on again without a hitch.
Mission Specialists Bob Curbeam and Christer Fuglesang began their second spacewalk at 1:41 p.m. CST. Less than two hours later, they had the first half of the station's permanent power system - channels two and three - up and running, taking advantage of power generated by the solar arrays delivered in September.
N5VHO – Thu, 2006 – 12 – 14 23:46
ISS Radio Report
Date/Time:
12 years 2 weeks ago
Mode:
PACKET
Status:
NOT ACTIVE
Uplink:
VHF
Downlink:
VHF (other) Description:
9 elevation degree. 19:30 utc. nothing heard.
MAURICIO BERALDO PY4MAB
BRAZIL
PY4MAB – Thu, 2006 – 12 – 14 20:35
ISS Radio Report
Date/Time:
12 years 2 weeks ago
Mode:
PACKET
Status:
NOT ACTIVE
Uplink:
VHF
Downlink:
VHF (other) Description:
14 ELEVATION DEGREE. 17:50 UTC. NOTHING HEARD
MAURICIO BERALDO PY4MAB
BRAZIL
PY4MAB – Thu, 2006 – 12 – 14 18:56
Will you try to use ANDE and RAFT once they are deployed?
Yes
68% (47 votes)
No
4% (3 votes)
Not sure
28% (19 votes)
Total votes: 69
N5VHO – Thu, 2006 – 12 – 14 15:55
Amateur Radio Satellites Awaiting Launch, Deployment
N5VHO – Thu, 2006 – 12 – 14 15:38