Archive - Dec 2007
December 28th
ISS Radio Report
Date/Time:
11 years 2 days ago
Mode:
PACKET
Status:
ACTIVE
Uplink:
VHF
Downlink:
VHF (other) Description:
53 elevation degree 21:40 UTC.
MAURICIO BERALDO PY4MAB
BRAZIL
PY4MAB – Fri, 2007 – 12 – 28 22:46
ISS Radio Report
Date/Time:
11 years 2 days ago
Mode:
PACKET
Status:
ACTIVE
Uplink:
VHF
Downlink:
VHF (other) Description:
2120 UTC Packet active over N. America (EL29)
N5VHO – Fri, 2007 – 12 – 28 22:28
ISS Radio Report
Date/Time:
11 years 2 days ago
Mode:
PACKET
Status:
ACTIVE
Uplink:
VHF
Downlink:
VHF (other) Description:
Heard over strong signal - GI84ov. 73 and A happy new year to all.
PS8RF – Fri, 2007 – 12 – 28 21:09
ISS Radio Report
Date/Time:
11 years 2 days ago
Mode:
PACKET
Status:
ACTIVE
Uplink:
VHF
Downlink:
VHF (other) Description:
Good copy over Central England 13:34-13:42 UTC Pass 73 Chris
G0BHX – Fri, 2007 – 12 – 28 14:43
ISS Radio Report
Date/Time:
11 years 2 days ago
Mode:
PACKET
Status:
ACTIVE
Uplink:
VHF
Downlink:
VHF (other) Description:
Active packet radio from ISS at 12.10 utc over South East of Italy-qth Maglie (Lecce) jn90dc
i7pqd – Fri, 2007 – 12 – 28 13:12
ISS Radio Report
Date/Time:
11 years 2 days ago
Mode:
PACKET
Status:
ACTIVE
Uplink:
VHF
Downlink:
VHF (other) Description:
Good copy over Central England 10:24-10:33 UTC Pass 73 Chris
G0BHX – Fri, 2007 – 12 – 28 11:50
Shuttle Team to Modify Fuel Sensors; Jan. 10 launch off
The Space Shuttle Program met Thursday [Dec. 27] to assess the progress made to troubleshoot an issue with the engine cutoff sensor circuit that occurred during the recent launch attempts and tanking test. Instrumentation installed for the tanking test indicate that there are one or more intermittent open circuits in the area of the feed through connector on the external tank's liquid hydrogen tank.
The external parts of the connector will be removed and replaced with others that have been strategically soldered to ensure pin-to-socket connectivity and allow continuous electrical flow from sensors inside the external tank to the shuttle's computers.
N5VHO – Fri, 2007 – 12 – 28 11:06
ISS Radio Report
Date/Time:
11 years 2 days ago
Mode:
PACKET
Status:
ACTIVE
Uplink:
VHF
Downlink:
VHF (other) Description:
Strong packet signals from ISS at 09.00 utc over S.E. Italy-qth Maglie (Lecce) jn90dc.
i7pqd – Fri, 2007 – 12 – 28 10:01
ISS Radio Report
Date/Time:
11 years 2 days ago
Mode:
PACKET
Status:
ACTIVE
Uplink:
VHF
Downlink:
VHF (other) Description:
Strong packet signals from ISS at 07.23 over S.E. Italy -qth Maglie (Lecce) jn90dc.
i7pqd – Fri, 2007 – 12 – 28 08:25
December 27th
ISS Radio Report
Date/Time:
11 years 3 days ago
Mode:
PACKET
Status:
ACTIVE
Uplink:
VHF
Downlink:
VHF (other) Description:
22 elevation degree 22:50 UTC.
MAURICIO BERALDO PY4MAB
BRAZIL
PY4MAB – Thu, 2007 – 12 – 27 23:59